Amazon Delivery Station — Composite Drive

In collaboration with the TW Development Group, the Amazon Delivery Station’s “last mile delivery” facility revitalizes the distressed industrial facilities of Kettering, Ohio. 

    • Start Date: July 2017
    • Owner: TW Development
    • Location: Kettering, Ohio
    • General Contractor: Turnbull-Wahert Construction
    • Lead Contractor: Butler Asphalt
    • Project Type: Highway Construction
    • Expected End Date: August 2019

    About this Project

    tons of surface asphalt

    tons of intermediate asphalt

    tons of 304 stone

    The Amazon Delivery facility is a 15-acre site for the Fortune 100 e-commerce retailer. In collaboration with the TW Development Group, the facility will include 700 new parking spaces. A 196,000 square-foot light industrial building was acquired in July of 2017. As a distressed asset, it requires a plan that includes upgrades to existing buildings as well as creative marketing for the space around the delivery center. 

    Butler Asphalt is currently collaborating with the TW Development Group on this project. To find out more about the project, check out TW Development’s blog here.

    Contact Us

    11641 Mosteller Rd., Cincinnati, OH 45241

    +00 513 771 0820

    info@jrjnet.com